Operation & Maintenance

Thanh An » Operation & Maintenance

Process of maintaining wastewater treatment systems

1. Preparation: – Necessary protective equipment: Safety helmets, protective gloves, safety shoes… Warning board – Necessary tools: Water pressure pump Electric tester VOM meter Flashlight Traction pump, balang… Device removal

The problem foaming at Aerotank

The problem of foaming at Aerotank in wastewater treatment operation 1. Cause of load shock: Causes of Aerotank tank shock load causing foam to float on the surface: – Waste

Gallery

Sản phẩm